How much does it cost to upgrade an electrical panel? For an early budget in Seattle, Bellevue and the Puget Sound area, allow $3,000–$5,000 for a straightforward panel replacement or $5,000–$8,000 for a straightforward 100 amp to 200 amp service upgrade. These are illustrative planning ranges used by this calculator, not a published market average or a fixed Shudko Electric quote. Difficult access, utility work and relocation can put a project above these ranges.
The first step is knowing what you need: a new breaker panel, more service capacity, or both. Use the calculator below to explore a starting budget, then request a written estimate for your property.
Simple electrical panel upgrade cost calculator
Choose the work you are considering. Your range updates immediately; no contact details are required.
YOUR STARTING BUDGET
$3,000–$5,000
Panel replacement at the existing location.
Get My Panel Upgrade Estimate →Planning estimate only. Assumes a conventional residential panel, normal access, existing circuits reconnected, ordinary grounding/bonding updates, electrical permit and inspection coordination. Excludes sales tax, utility charges, trenching, relocation, wall repairs, new circuits, smart panels, solar/battery integration and major wiring corrections. Final scope and price require a site review and utility confirmation.
Panel replacement cost versus 200 amp service upgrade cost
| Project | Starting planning range | What changes |
|---|---|---|
| Panel replacement, same service size | $3,000–$5,000 | Breaker panel, compatible breakers, circuit reconnection and labeling; existing supply capacity stays the same. |
| 100 amp to 200 amp service upgrade | $5,000–$8,000 | Panel plus service equipment and conductors as required for the approved design. |
| Relocation, underground construction, multiple meters or larger services | Site-specific estimate | Utility design, routing, excavation and equipment determine the scope. |
Replacing a 100 amp panel with a panel rated for 200 amps does not by itself give the home 200 amp service. The meter equipment, service conductors, disconnects and utility supply must support the approved service rating. The calculator uses the same base range for a straightforward 125A or 150A upgrade to 200A; existing equipment may change the actual scope.

What affects the cost to replace an electrical panel?
- Panel condition and circuit count. Reconnecting an organized installation is different from correcting damaged wiring or extending many short conductors.
- Meter and panel location. Moving equipment can require new feeders, routing, wall openings and utility review.
- Overhead or underground supply. Underground upgrades may need new conduit, trenching or utility conductors. Existing underground service does not automatically mean excavation is needed.
- Grounding, bonding and disconnect requirements. The existing installation and approved scope determine what needs updating.
- Equipment selection. Standard panels and smart panels have different equipment and installation costs. Required breaker types also affect the total.
- Utility charges and repairs. Utility engineering or connection charges, drywall, painting and concrete restoration should be identified separately in the estimate.
What should your written estimate include?
Compare the same scope when reviewing quotes: panel brand and circuit spaces, included breakers, meter equipment, service conductors, grounding and bonding, surge protection, permit, inspection coordination and utility scheduling. Ask whether taxes, utility fees and finish repairs are included. A low panel-only price cannot be compared directly with a full service upgrade.
Our calculator includes ordinary installation work and electrical permitting in its base assumptions. It leaves project-specific extras out of the total rather than guessing what your property needs. Your written estimate identifies the actual inclusions and exclusions.
Seattle, Bellevue and Puget Sound utility coordination
For a Seattle City Light service upgrade, use the utility’s application process and confirm the required project documents. City Light requires the electrical permit number and local approval before permanent connection approval. PSE also coordinates service modifications, with project requirements such as design approval, inspection and payment where applicable affecting scheduling. Utility review is separate from the electrician’s installation work.
Read our guide to electrical permits and inspections. Explore a real Bellevue 100A to 200A upgrade and our Shoreline panel replacement to see how scopes differ.
Do you need 200 amp service?
An EV charger, heat pump or remodel is a reason to review capacity, not an automatic reason to upgrade. Your equipment ratings and an electrical load calculation help determine the right service size. Compatible load management or a lower EV charging rate may be an option. Try our home electrical load calculator for preliminary planning, then have the actual loads and equipment reviewed.
Frequently asked questions
What is the average cost to replace an electrical panel?
A single average can hide very different projects. This guide uses $3,000–$5,000 for a straightforward replacement as an illustrative budget. A full capacity upgrade or major corrections require a different scope.
How much does it cost to upgrade an electrical panel to 200 amps?
Start with $5,000–$8,000 for the straightforward service-upgrade assumptions in this guide. Utility charges, relocation, trenching, taxes and other excluded work can increase the total. Confirm your property’s requirements before relying on a budget.
Will a 200 amp panel lower my electric bill?
More service capacity does not directly reduce energy use. The upgrade supports the approved electrical loads; energy costs depend on what equipment you operate and how you use it.
How long will power be off?
Expect a planned interruption for service work. The outage window depends on the installation, inspection and utility reconnection sequence. We discuss the expected window before work; utility scheduling can also affect the overall project timeline.
Can I get a price without knowing my panel size?
Yes. Select “I’m not sure yet” for a broad starting range. For an estimate, share your address and photos of the closed panel, visible labels and meter area. Leave panel covers in place.
Get a panel upgrade estimate for your home
Shudko Electric serves Seattle, Bellevue, Tacoma and surrounding Puget Sound communities. Tell us about your current panel and planned improvements so we can define the work and prepare a property-specific estimate.
Get a Free Panel Upgrade Estimate →
