A service upgrade can be a good time to reconsider where the meter and panel sit—but moving either one changes the project scope. For a King County homeowner, the first question is whether the existing location can support the planned equipment and utility connection.
Start with the whole route
Ask your electrician to review the current meter, panel, service connection, and proposed location together. A move may affect conductors, mounting, access, and the path from the utility supply to the home. A panel replacement at the same service size is a different project from relocating a meter and increasing service capacity.

Bring the utility in early
Seattle City Light requires an electric service application for alterations to existing service and lists a project address and service type among its application details. Many projects also require drawings or load calculations. In PSE territory, PSE directs customers to contact its construction team for modifications or relocation of a service line or meter. The utility’s review can shape the approved location and schedule.
Plan the sequence
Utility design, permits, inspection, and reconnection can be separate steps. PSE’s published project process identifies design approval, applicable payment, site preparation, and inspection among the dependencies that can affect scheduling. Your electrician can explain which steps apply to your address and what power interruption to expect. Choose the installation date after those requirements are known.
Compare written scopes
Ask whether the estimate includes the meter equipment, panel, conductors, grounding and bonding work, permit, utility coordination, and any wall or site restoration. If you also plan an EV charger, heat pump, or addition, share those plans before the service size is selected.
Keep covers closed and leave service equipment and utility connections to qualified professionals. In Washington, electrical work generally requires a permit and inspection, with limited exceptions; the responsible permitting agency depends on the jobsite. See Washington L&I’s permit guidance.
For an example of how meter relocation can be part of a complete upgrade, see our Bellevue 100A-to-200A project.